Skip to content

Manufacturing Tooling News

Development, Sourcing & Lifecycle Insights for Manufacturing Tooling

  • Home
  • About Us
  • Tooling Development
    • Tooling Design & DFM
    • Prototyping & Trial Runs
    • Tooling Modification
  • Tooling Sourcing & Procurement
    • RFQ & Tooling Quotes
    • Supplier Evaluation & Selection
    • Tooling Cost & Procurement
    • Tooling Requirements & Purchasing
  • Tooling Quality & Acceptance
    • Tooling Inspection
    • Trial & Sample Approval
    • Tooling Acceptance
  • Tooling Lifecycle
    • Tooling Maintenance
    • Tooling Repair & Refurbishment
    • Tooling Performance & Wear
    • Tooling Replacement & End of Life

Category: Tooling Development

Guidance on developing manufacturing tooling from design planning through trials, revisions, and preparation for production.

What Should Be Done When First Trial Samples Are Off Size

Posted on 2026-09-152026-09-16
What Should Be Done When First Trial Samples Are Off Size
Prototyping & Trial Runs, Tooling Development

The first tooling trial is often the point when a design moves from drawings and discussions into something that can be checked in the real world. A sample may look close to the intended shape, yet a measurement can show that one area is too large, too small, too thick, or too thin. That does ... Read More "What Should Be Done When First Trial Samples Are Off Size" »

How Should Tooling Part Fit Dimensions Be Confirmed

Posted on 2026-09-012026-09-16
How Should Tooling Part Fit Dimensions Be Confirmed
Tooling Design & DFM, Tooling Development

When several tooling parts work together, their fit cannot be decided by looking at one part alone. A locating pin, guide component, insert, plate, slide, or other mating part may each have a suitable dimension on its own, yet the assembled tooling can still feel too tight, too loose, or difficult to use. This is ... Read More "How Should Tooling Part Fit Dimensions Be Confirmed" »

Recent Posts

  • Can a Supplier Handle Complex Tooling Work
  • What Should Be Done When First Trial Samples Are Off Size
  • When Should Tooling Lubrication Be Performed
  • How Can Tooling Parts Be Checked Against Drawings
  • What Should a Complete Tooling RFQ Include

Archives

  • September 2026

Categories

  • Tooling Lifecycle
    • Tooling Maintenance
  • Tooling Quality & Acceptance
    • Tooling Inspection
  • Tooling Sourcing & Procurement
    • Supplier Evaluation & Selection
    • RFQ & Tooling Quotes
  • Tooling Development
    • Prototyping & Trial Runs
    • Tooling Design & DFM

Powered by Manufacturing Tooling News © 2026

Copyright © 2026 Manufacturing Tooling News.

-->